An instruction to produce a set quantity of a product, consuming components from a BOM and recording labour and output.
A work order, sometimes called a manufacturing order or production order, is the ERP record that authorises production of a specific quantity of an item. It pulls the bill of materials, reserves or consumes components from stock, tracks operations through work centres, records labour and machine time, and books finished goods into inventory.
It matters because the work order is where planned cost meets actual cost. A UAE manufacturer that wants to know the real margin on a job, or why a project overran, needs work orders that capture actual consumption and time, not just the theoretical BOM. It is also where batch and serial traceability is recorded, which matters in pharma, food and aluminium.
In an ERP project, keep the shop-floor process simple enough that workers will actually record against it: tablet or barcode confirmations rather than paper. Decide whether to backflush components automatically or record them manually. Link work orders to sales orders for made-to-order businesses so project costing works end to end.
A 30-minute look at how your business runs today, with a senior consultant. Free, and the findings are yours.
Book a 30-minute discovery call