Home / Case Studies / AQLEH Engineering Consultant
Engineering & Consulting

A new flagship website for a Dubai engineering consultancy: fast, mobile-first, Arabic-ready.

A Dubai engineering consultancy replaced its website with a fast, mobile-first flagship site built, hosted and maintained by Kaido.

ClientAQLEH Engineering Consultant
WebsiteVisit site ↗
IndustryEngineering & Consulting
RegionUAE
ScopeWebsite rebuild
PlatformWeb
New
Flagship site
<1s
First paint
Mobile
first design

The challenge

AQLEH Engineering Consultant is a Dubai engineering consultancy whose work is won on reputation and references. Its previous website had aged: slow to load, awkward on mobile and no longer representative of the projects the firm was delivering.

The firm wanted a flagship site that would stand up to a client or authority looking the practice up, load fast on any device, carry a video introduction, and be ready to add Arabic without a second rebuild.

What we did

Kaido designed, built and hosts a flagship website that presents AQLEH's engineering work with the weight it deserves.

The result

A new flagship website for a Dubai engineering consultancy: fast, mobile-first, Arabic-ready.

A flagship site should load fast, read well on a phone and look like the firm behind it. That was the brief.Kaido IT Solutions

Why it worked

Kaido ran the website like any other delivery: a fixed scope and price agreed before design started, a signed design direction before build, and a performance budget checked at every stage rather than at the end. Media was compressed and lazy-loaded so the video hero does not cost the first paint, and the page structure was built for two languages from the start.

Kaido hosts and maintains the site under an ongoing arrangement, so content updates, new project pages and the Arabic edition are handled without the firm needing a developer in house.

Different industry, same leak.

See what this would look like in your operation. A 30-minute audit with a senior consultant, findings yours to keep.

Book a 30-minute discovery call →
← See all Kaido case studies