The challenge
Al Taresh runs a trading and retail operation that had grown on separate tools for purchasing, stock and sales. Reconciling them was a daily manual task.
Inventory accuracy drifted and order handling slowed under the weight of manual work. The business needed one system across the whole cycle.
What we did
Kaido replaced disconnected tools with one system across the trade and retail cycle.
- One ERP across purchasing, stock and sales
- Accurate, current inventory with a single source of truth
- Faster order handling with less manual reconciliation
- Validated migration and role-based training across the business
Higher inventory accuracy and faster order handling on one source of truth.
One system, one set of numbers we can trust.Al Taresh
Why it worked
The outcome came from the discipline every Kaido engagement runs on. Scope and price were fixed and signed at the blueprint gate, so there were no surprises. Data migration was validated and reconciled before go-live rather than hoped to be right. Training was role-based and repeated until the system stuck with the team on the ground, not just in a manual. And the senior consultant who scoped the project is the one who delivered it, so nothing was lost in a handoff.
Al Taresh has stayed on a Kaido 24/7 AMC support arrangement since go-live, so the system keeps pace with the business instead of drifting back toward spreadsheets.
Different industry, same leak.
See what this would look like in your operation. A 30-minute audit with a senior consultant, findings yours to keep.
Book a 30-minute discovery call →